01
Read the drawing
LumenTakeoff works from the structure and geometry inside supported PDFs instead of relying on visual guesses alone.
37 instances
E-201, E-202, E-203
Counted from plan geometry
LumenTakeoff reads electrical plan geometry to turn repeated lighting symbols into exact, reviewable fixture counts.
You keep control of scope and naming. The repetitive counting happens underneath.
The film
From a PDF to an exact, reviewable count. Every fixture in the film sits where the engine actually found it on the demo set.
01The manual problem
Lighting takeoffs are repetitive, high-stakes work. LumenTakeoff handles the repeated counting so the estimator can stay focused on scope, exceptions, and the bid.
02The difference
A quantity that goes into a bid has to be defensible. Every number LumenTakeoff produces can be traced back to the geometry and the sheet it came from.
01
LumenTakeoff works from the structure and geometry inside supported PDFs instead of relying on visual guesses alone.
02
Repeated fixture geometry becomes one family, one quantity, and one review decision.
03
Schedule, legend, prior confirmation, or unresolved. The product shows why a name or scope decision is being suggested.
03The takeoff
One sheet, one family, one panel of evidence. The plan stays the main object — not a dashboard wrapped around it.
37 instances
Identical geometry, matched across E-201, E-202 and E-203.
4 legend variants
The drawing does not resolve this one. The estimator decides.
04How it works
Supported vector PDFs enter the takeoff pipeline.
Repeated lighting geometry is grouped and counted.
New, existing, relocated, demolition, or review-required.
Schedule, legend, prior confirmations, and ranked suggestions are shown separately.
One estimator decision applies to the whole family and can help the next project.
05Human control
LumenTakeoff is designed to automate repetition without hiding uncertainty. If the drawing does not support a confident answer, the estimator sees the ambiguity instead of a fabricated result.
37 fixtures
Type A1 — matched to the fixture schedule on E-101.
Junction box
The legend carries 4 variants of this symbol across 31 instances. Pick one, or leave it open.
9 instances
The count is exact. The drawing never names the type. It stays unnamed.
An unnamed exact count is acceptable. A confidently wrong name is not.
06Naming ledger
When an estimator confirms a fixture family, LumenTakeoff retains that decision within the appropriate firm and project context, so repeat drawing styles arrive with less to review.
Midtown Medical Office
The estimator reviews the family once and confirms the type against the schedule.
Riverside Clinic Fit-Out
The same geometry appears in a new plan set. The prior confirmation arrives as evidence — not as an answer.
Confirmed knowledge, scoped to your firm. The estimator still makes the call on every project.
07Built for electrical
One trade, understood properly. The symbols, the schedule, the legend, and the remodel scope conventions an electrical estimator already works with every day.
08Proof
LumenTakeoff is early and in active development with electrical estimators. Percentages get published here when they are measured, not before.
Development runs against production electrical drawings, not synthetic test fixtures.
Counts are checked against the hand takeoff an estimator would have produced.
The review workflow is shaped by the way estimators already work a plan set.
Deterministic counting on supported vector geometry — and a visible flag where it isn't.
Bring a plan set
Run a real lighting takeoff and review the result against the way your team works today.
Built for electrical estimators. Your address is used to reply about LumenTakeoff and nothing else.